Keith, G6NHU: Days 334, 335 and 336 – Not much happening

Posted on December 3, 2011 by

0



This is a very small update.  The bands have been really dead in the evenings and the fact that I didn’t have an aerial for 40m following it falling down means it’s been a difficult three days.

Day #334 was when the aerial fell down, I worked EA3DTD, Toni on 40m using half a dipole and KB2UZY, Bryan on 20m.  On day #335 I struggled through a pileup to work FM/F5UFX, Sebastien in Martinique on 20m and on day #336 all I managed was a 20m JT65 contact with DK6XY, Klaus.

Advertisements
Tagged:
Posted in: Keith G6NHU